VoltBase Group Ltd · EV InfrastructureDelivering power. Building futures.
Commercial EV infrastructure

The groundwork behind what’s next.

VoltBase Group delivers the civil and electrical infrastructure packages that bring commercial EV charging and battery energy storage sites together — from duct routes and bases to reinstatement and handover.

Groundworks. Infrastructure. Site delivery. Built around the detail.
Illustrative site package · plan viewVB / 01
Illustrative layout showing EV chargers, a feeder pillar, battery storage and duct routes SITE ACCESS / PARKING AISLE FP 01 02 03 BESS FEEDER PILLAR CHARGER BASES BESS PAD DUCT ROUTE
Connected infrastructure, coordinated on siteConcept illustration
From first dig to final finishOne coordinated work package.
01 EV charging infrastructure
02 Battery storage enabling works
03 Civil & electrical scope
04 QA through to handover
What we deliver

Every element has to work together.

We bring the below-ground routes, equipment bases and visible site finish into one practical installation sequence.

01 / Groundworks

Ducting & routes

LV, communications and CCTV duct routes, trenching, draw pits and carefully coordinated reinstatement.

02 / Foundations

Bases & pads

Foundations for chargers, feeder pillars, BESS equipment and associated site furniture.

03 / Installation

Site equipment

Installation support for charger units, feeder pillars, bollards, signs and kerbs.

04 / Close-out

Finish & handover

Reinstatement, snagging, site clearance and the records needed to close out the work package.

A connected package

From route marking to reinstatement.

Our scope is set up to suit the site and project drawings. Work is sequenced around the interfaces between civils, electrical infrastructure, equipment and the finished surface.

01

LV & communications ducting

Power, comms and CCTV containment routes with associated trench works.

↗
02

Feeder pillar & charger foundations

Set out and construct equipment bases in line with project details.

↗
03

BESS pads & associated civils

Prepare the enabling works and bases for battery storage equipment.

↗
04

Bollards, signs & kerbs

Install site protection and finishing elements around charging bays.

↗
05

Surface reinstatement & close-out

Return the working area to its specified finish and record outstanding items.

↗
How we deliver

A clear sequence keeps the site moving.

Work packages are planned to match the site requirements, approved information and the interfaces with other trades.

01 / PLAN

Understand the site

Review drawings, scope, access, existing surfaces and the sequence needed on site.

02 / PREPARE

Set up safely

Coordinate the work area, checks and task controls before excavation and installation.

03 / INSTALL

Build the package

Deliver routes, bases, equipment interfaces and reinstatement in a coordinated order.

04 / CLOSE

Record & hand over

Capture progress, inspections, snags and completion information for the project team.

Quality & visibility

Good work should be easy to verify.

Clear site records help the project team see what has been completed, what has been checked and what still needs attention. Our workflow is designed to capture the job from daily set-up through to handover.

  • Daily progress updates
  • Vehicle & plant checks
  • Photo-backed QA
  • Snagging records
  • Materials requests
  • Project handover
Have a site coming up?

Let’s talk through the scope.

Email the VoltBase team
VoltBase Crew Network

Good people build good projects.

We are building a trusted network of experienced EV infrastructure crews and capable individuals for future projects across the UK.

Express your interest